PORT TARIFFS

Effective since November 2025

Concept Unit Rate USD
International Traffic Vessels Meters-LOA / Hour USD 0.86

Concept Unit Rate USD
General Cargo Ton USD 5.50
Solid Bulk Cargo Ton USD 4.50
Full Container 20' Unit USD 135.00
Full Container 40' Unit USD 165.00
Full Container 45' Unit USD 198.00
Empty Containers Unit USD 25.00
Ship-to-Berth Restows Unit USD 25.00
Full Flat Rack 20' Unit USD 142.00
Full Flat Rack 40' Unit USD 192.00
Full Open Top 20' Unit USD 142.00
Full Open Top 40' Unit USD 192.00
ISO Tank 20' Unit USD 142.00
Full 20' & 40' Containers - International Transit Unit USD 25.00
Empty 20' & 40' Containers - International Transit Unit USD 25.00

Concept Unit Rate USD
General Cargo Operation USD 1.10
Solid Bulk Cargo Operation USD 1.10
Full Maritime Container 20' Unit USD 25.00
Full Maritime Container 40' Unit USD 25.00
Empty Maritime Container Unit USD 6.00
Ship Supply Service Unit USD 138.00
Fuel Supply Ton USD 2.80
Fresh Water Supply Ton USD 7.70
Vessel Repair Assistance Operation USD 300.00
Pilotage Maneuver USD 15.00
Tugboat Maneuver USD 35.00

Concept Unit Rate USD
General Cargo / Bulk Moved (per ton) Ton USD 0.25
Contenedor (equipo Especial) o vacio movilizado via terrestre Unit USD 3.00
La tarifa del uso de las instalaciones portuarias puede tener descuentos en función del volumen y las condiciones comerciales.

Concept Unit Rate USD
Weighing Unit USD 25.00
Loading/Unloading Full Containers 20 or 40 Unit USD 65.00
Loading/Unloading Empty Containers 20 or 40 Unit USD 45.00
Reefer Connection/Disconnection at Yard Operation USD 25.00
Power Supply and Monitoring Day USD 60.00
Scanner Inspection Movements Cont. 20 & 40 Unit USD 180.00
Movimientos para Inspección DRY Conn. 20 O 40 (*2) Unit USD 460.00
Movimientos para Inspección DRY Ica/Invima/Dian Cont. 20 O 40 (*1) Unit USD 380.00
DRY Anti-narcotics Inspection Movements Cont. 20 / 40 (*1) Unit USD 430.00
Movimientos para Inspección Reefer Ica/Invima/Dian Cont. 20 / 40 (*1) Unit USD 560.00
Reefer Anti-narcotics Inspection Movements Cont. 20 / 40 Unit USD 610.00
Llenado / Vaciado Contenedores DRY de 20 y 40 para carga paletizada en CFS (*2) Unit USD 355.00
Llenado / Vaciado Contenedores DRY de 20 y 40 para carga no paletizada en CFS (*2) Unit USD 385.00
Stuffing/Stripping Reefer 20 / 40 Containers in Cold Room (*3) Unit USD 400.00
Transloading in Cold Room Unit USD 820.00
Transloading in CFS Unit USD 720.00
Container Re-weighing Service Unit USD 160.00

Concept Unit Rate USD
Loading/Unloading General Cargo Ton USD 9.50
General Cargo Porterage Ton USD 15.00
Inspection Mobilization Ton USD 8.50
ICA/INVIMA/DIAN Inspection Operation USD 35.00
Pre-inspection Operation USD 45.00
General Cargo Re-weighing Service Operation USD 97.60
Nota: En caso de que los MT3 sean mayores a las Tons, facturar con base al MT3.

Concept Unit Rate USD
Additional Hour or Standby Cold Rooms Unit USD 40.00
Setting Change Unit USD 12.00

Concept Unit Rate USD
Duplicate Invoice Issuance Unit USD 40.00
Announced Weight Correction Unit USD 70.00
Document Change Unit USD 35.00
Roll-over Container USD 60.00
VGM Certification Container USD 25.00
Invoice Cancellation Request Invoice USD 15.00
Costos administrativos cambio de modalidad para autorizar vaciados de FCL a LCL Container USD 60.00
Sub Bill of Lading Filing BL USD 25.00
Anulacion/Corrección servicios a la carga / cambio de consignatario BL/Booking BL USD 35.00
Omisión / Cambio o corrección de IMO Container USD 200.00
Outside Cut Off Container USD 120.00
Appointment Non-compliance / Full-Empty Units Appointment USD 15.00
Seal Supply Seal USD 5.00
Technical Assistance Service Unit USD 50.00
Disposition Change Unit USD 75.00
Early Entry Container USD 170.00
Additional Hour or Standby with DRY Cargo Unit USD 30.00

Concept Day 1 to 3 Day 4 to 5 Day 6 to 10 Day 11 onwards
Covered Space Libre 2.50 3.50 5.00
Open Space Libre 1.70 2.50 3.80

Concept Day 1 to 3 Day 4 to 5 Day 6 to 10 Day 11 onwards
Full Containers 20' Libre 30.00 40.00 60.00
Full Containers 40' Libre 35.00 45.00 70.00
Oversized 45' Libre 41.50 60.50 81.00
Open Top 20' Libre 47.00 65.00 86.00
Open Top 40' Libre 65.00 82.00 105.00

Concept Day 1 to 3 1st Decade 2nd Decade 3rd Decade
% CIF USD Value Libre 0.80% 0.95% 1.25%

Range Tons / Year % Discount
Range 1 80,000 - 140,000 5%
Range 2 140,001 - 200,000 10%
Range 3 > 200,001 15%

Concept Surcharge
Dangerous Cargo 25%
Oversized Cargo 25%
Explosive Cargo 40%
NOTES
  • UIC charges will be invoiced by PBCU in USD, settled at the exchange rate (TRM) on the invoice issuance date. Does not include oversized cargo.
  • *1 Includes up to 3 hours of operation. Additional hours will be charged according to the tariff schedule.
  • *2 Includes up to 5 hours of operation. Additional hours will be charged according to the tariff schedule.
  • *3 Includes up to 5 hours of power. Additional hours will be charged according to the tariff schedule.
  • If the client's representative is not present during the service, the operation will be rescheduled and charged according to the tariff schedule.
  • Stuffing and stripping for inspections do not include specialized lashing.
  • *4 Includes a standard 3-ton forklift. If additional or special equipment is required, it will be charged per hour according to the current tariff.